A 5 Bay Modular office and welfare facility building 9.95m x 15m, was provided which included an entrance Lobby/reception, DDA WC facility, A single shower and staff WC’s with wash hand basins, a fully fitted kitchen with dining area, A large open plan staff office and a large area for lockers and staff changing, this project was a turnkey project which included all the services to the site including Electrics, Water, Waste - drainage plus foundations. The site was finished off with a pathed area to and from the car park