Client: Network Rail, Stafford
150,000.00
Overview:
A brand new 4 Bay Modular office and welfare facility building 12m x 12m, was provided which included an entrance Lobby/reception, DDA WC facility, , a fully fitted kitchen and a large open plan staff office along with a covered staircase, this project was a turnkey project which included all the services to the site including Electrics, Water, Waste - drainage plus foundations. The site was finished off with a pathed area to and from the car park
The Problem
Network rail were looking to provide a modern office building as the existing facility was old and didn’t work for a modern office environment. The main issue here was space
The Solution
To provide a Modular building which would have the room and facility for the current staff to operate within a modern facility which would enhance there working environment and experience. The building had the benefits of air conditioning, suspended ceiling with energy saving LED lighting and due to space being an issue Spacebuilder sited the building over the top of an existing building using steels, which were piled and braced
The After
Spacebuilder Limited provided a fantastic Modular within a eight-week period
The help and support we received from the team from design to installation was invaluable, particularly when making key decisions
Sandy Jefferson - Bursar
JH Godwin Primary School